Was driving to one of our properties and noticed 'just down the road' a coil of (probably) Fibre halfway up pole, and CBT at top of pole. Our pole which is fed overhead and some 200m further down and is last but one at end of line, has no sign of Fibre, ours is the only property fed directly off that pole, the lines carry on another 200m to the last pole which feeds the last house.
A check online and shows FTTP available and a 1 stage install.
Would a line which had to be 'strung' along a couple of poles before getting to our property be a '1 stage' install?



Pages in this thread:
Print Thread
