In reply to a post by EnglishRob:Well I've registered my interest, not sure what to do though when it eventually comes to Torquay.
Depending how long it takes to arrive, I may upgrade to 50Mbit in the mean time. At least that way the jump in price isn't going to be as much for me (I'm paying something like £20 a month for 20 Meg, so I gather 50Meg is about an extra £8 a month).
At the moment I can't think of what I'd need a 100Mbit connection for, but then again I thought the same about 2Mbit back in 2002 when I got ADSL.
Rob
50MB IS frickin awesome!



Pages in this thread:
Print Thread
deleted