Hi all,
Well an update BT max was enabled this morn checked my speed with the BT speed tester and was getting the following.
IP profile for your line is - 2000 kbps
DSL connection rate: 448 kbps(UP-STREAM) 8128 kbps(DOWN-STREAM)
Actual IP throughput achieved during the test was - 1855 kbps down
So will the downstream go up after the 10 day training period is that as good as Im going to get i.e. the same as I had before on my 2Mb connection ?
Checked my wireless routers status and got the following
DSL Path Mode: INTERLEAVED
Downstream Rate: 8128 Kbps
Upstream Rate: 448 Kbps
Downstream Margin: 19 db
Upstream Margin: 25 db
Downstream Line Attenuation: 16
Upstream Line Attenuation: 7
Speed test using the thinkbroadband gave the following
http://www.thinkbroadband.com/speedtest/results/id/117006474872996110831.html
Confussed whats happening please ?