After over 2 years of staring at fibre coiled up at the top of BT poles after the failed BDUK build we are finally seeing progress.
Every pole in the village now has CBT's on them. Today I noticed a random bod in dirty high vis overalls climb into our back garden (current cables run over our garden pole to pole) pull a cable in over the caravan before clambering out again (bloody good job the dogs weren't loose in the garden).
Anyway cable was strung to the next pole & cabled up to the CBT on there & now they've worked their way back out to the road. So hopefully the fibre feed should be done too. Bits of blue rope have been appearing all over too which is good news too.
So hopefully should be tested & commissioned soon, so fed up with flaky 4g & not paying £30 a month for under 8Mbps fttc.
The contractors installing suggested it should be ready to order for entire village by the end of this month. Can't wait it will literally change my life.