Engineer was early for his PM slot. Insisted on changing master socket and disconnecting me extensions. Has been to the green box and exchange.
Reckons it is the cable from the post at the top of me drive to the first chamber under pavement is corroded completely. Intermittent dialtone.
Told me dig team might be later this week - believe that when I see it.
Was that just his opinion regarding a dig team or has a team been formally assigned to the job?



Pages in this thread:
Print Thread
